HAVI’s food logistics platforms in Tenerife and Gran Canaria

HAVI’s food logistics platforms in Tenerife and Gran Canaria

Once again, HAVI LOGISTICS FSL has relied on our Engineering team to develop two simultaneous projects for the expansion and refurbishment of HAVI’s logistics platforms for food products in Tenerife and Gran Canaria, located in Tenerife and Gran Canaria respectively.

In both cases, artica+i has been in charge, not only of the study, design and definition of the project, but also during the execution and construction management stage, supporting our client to ensure compliance with the project and minimise possible deviations in productivity, quality, budget and deadlines.

The project for the HAVI platform in Tenerife included not only the extension of the 985 m2 industrial building, but also the refurbishment of the existing 1,315 m2 building. In this way, a double objective has been achieved: on the one hand, thanks to the extension work, a frozen and a refrigerated cold room, a dispatch area and a machine room on a mezzanine have been fitted out. On the other hand, thanks to the platform refurbishment project, HAVI now has a new space for the dry goods storage area, a battery charger, an auxiliary warehouse and an office space. All of this will be completed in 10 months between December 2020 and September 2021.

For its part, the HAVI platform project in Gran Canaria has consisted mainly of the adaptation of the building annexed to its logistics platform, having doubled its capacity to include a warehouse of 3,500m2. In addition, a refrigerated chamber for frozen and reserve products, a battery loading room and an office space have been installed. This project had an execution period of 8 months, between December 2020 and July 2021.

Finally, it should be noted that both projects also included the expansion and modification of its refrigeration facilities with the aim, not only of expanding the refrigeration equipment, but also of achieving the elimination of R404 type gases, with the new technology installed being more sustainable and environmentally friendly.